Skip to content

Update package-lock file and remove coveralls #24

Update package-lock file and remove coveralls

Update package-lock file and remove coveralls #24

Re-run triggered September 25, 2025 12:41
Status Failure
Total duration 28s
Artifacts –

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (7.4)
Process completed with exit code 1.
build (5.6)
The operation was canceled.
build (5.6)
The strategy configuration was canceled because "build._7_4" failed
build (8.3)
The operation was canceled.
build (8.3)
The strategy configuration was canceled because "build._7_4" failed