Skip to content

[FIX] Integrate never-worked baseline handling into CI reporting#1058

Draft
Rahul-2k4 wants to merge 5 commits into
CCExtractor:masterfrom
Rahul-2k4:feat/never-worked-baseline-integration
Draft

[FIX] Integrate never-worked baseline handling into CI reporting#1058
Rahul-2k4 wants to merge 5 commits into
CCExtractor:masterfrom
Rahul-2k4:feat/never-worked-baseline-integration

Merge pull request #2 from Rahul-2k4/copilot/review-upstream-necessity

15d34d7
Select commit
Loading
Failed to load commit list.
WIP / WIP succeeded Mar 11, 2026 in 0s

Ready for review

No match found based on configuration

Details

By default, WIP only checks the pull request title for the terms "WIP", "Work in progress" and "🚧".

You can configure both the terms and the location that the WIP app will look for by signing up for the pro plan: https://github.com/marketplace/wip. All revenue will be donated to Processing | p5.js – one of the most diverse and impactful Open Source community there is.