Bump org.cyclonedx:cyclonedx-maven-plugin from 2.9.1 to 2.9.3 - #55
Merged
san-zrl merged 1 commit intoAug 20, 2026
Merged
DCO-2 / DCO
succeeded
Aug 18, 2026 in 0s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | a63a014 | Bump org.cyclonedx:cyclonedx-maven-plugin from 2.9... | Skipped: sign-off not required in bot commit |
Loading