Skip to content

Update mobench.org for Mobench v0.1.47#9

Merged
dcbuild3r merged 13 commits into
mainfrom
codex/mobench-v0.1.46
Jul 20, 2026
Merged

Update mobench.org for Mobench v0.1.47#9
dcbuild3r merged 13 commits into
mainfrom
codex/mobench-v0.1.46

Conversation

@dcbuild3r

@dcbuild3r dcbuild3r commented Jul 19, 2026

Copy link
Copy Markdown
Collaborator

Summary

  • preserve the current main / mobench.org React UI with no layout or styling changes
  • update the landing page, visible version, metadata, and existing-design OG images to Mobench v0.1.47
  • extend the release documentation through v0.1.47, including bounded completion timeouts, iOS heartbeats/result transport, Android native-worker diagnostics, serialized credentialed lanes, and exact-head API retries
  • update the reusable workflow example to the final immutable pin f36ea5420bdb6633a6b8e91b00522ca9d5a2a84f
  • add detailed real-project case studies for merged ProveKit PRs #450 and #451 to both BrowserStack CI and Examples explained
  • make Examples explained standalone: benchmark crate and setup semantics, generated Noir fixtures, native C ABI configuration, ordinary Cargo CI gating, /mobench dispatcher, reusable-workflow invocation, device matrices, BrowserStack credential boundary, execution ordering, completeness checks, artifacts, and the main/v1 workflow difference
  • distinguish the merged ProveKit workflow reference (8a2dfbb2ba941aa6a6582bf49dae482cc87779df) from the recommended final reusable-workflow pin for new callers

No CSS, layout, routing, framework, or deployment configuration differs from main.

Verification

  • bun install --frozen-lockfile
  • bun run build
  • bun run og:generate
  • git diff --check
  • both Git-integrated Vercel checks passed for head 11848af1bc9b41bdfb468b5777695160d52e8fad
  • Vercel API confirms the mobench.org preview is READY, built by Vite from PR Update mobench.org for Mobench v0.1.47 #9 and the expected head SHA
  • deployed /browserstack and /examples routes return the updated v0.1.47 and ProveKit integration metadata

Preview

Production remains unchanged.

@vercel

vercel Bot commented Jul 19, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
mobench-org Ready Ready Preview Jul 20, 2026 1:18pm
mobench.org Ready Ready Preview, Comment Jul 20, 2026 1:18pm

@dcbuild3r

Copy link
Copy Markdown
Collaborator Author

Exact-head Vercel previews for bd1f29f are READY and verified with authenticated HTTP 200 responses:

GitHub Site acceptance is green. The automatic legacy Vercel root-project checks are superseded by these app-scoped prebuilt deployments. No production deployment or promotion was performed.

@dcbuild3r

Copy link
Copy Markdown
Collaborator Author

UI reset completed at abc4734. The PR now has the same React/Vite presentation layer as main; its net diff is limited to release copy, docs content, version metadata, and regenerated existing-design OG cards.

Verified preview: https://mobenchorg-git-codex-mobench-v0146-convergence-labs.vercel.app

Both Vercel checks pass, and rendered preview/production parity was confirmed for the title, hero, navigation, background, and layout. No production deployment was performed.

@dcbuild3r dcbuild3r changed the title Update mobench.org for Mobench v0.1.46 Update mobench.org for Mobench v0.1.47 Jul 20, 2026
@dcbuild3r
dcbuild3r merged commit b94a8c7 into main Jul 20, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant